Shopping Cart : Empty
Enter your email address below to be automatically reminded about the event:
day(s) prior to the event date

AK21-011A Wasilla, Alaska

AK21-011a
Bathroom Renovation
Wasilla, Alaska

 
A team of experienced construction volunteers are needed to assist church in remodeling a bathroom to accommodate a stackable washer/dryer and in creating a shower stall. Job may require some framing, insulation, and sheet rock. The floor may need to be cut to accommodate pipes – or an in-line pump installed to force water out of the drain. Requestor will discuss all details with team leader. Team will be asked to provide building materials for the project. Team leader can discuss with requestor. Host church will provide housing for the teams in existing church and possibly in church member’s homes if needed. A kitchen is on site for the team to use for meal preparation. Some meals may be provided for team. Church has 15 passenger van and a 9 passenger Suburban for team’s use. Team will be responsible for fuel usage. Host church will provide opportunity for fishing and sight-seeing for the team. 
 
Length of Assignment: One week
Preferred Dates: Summer 2021
Costs: Travel to AK, some team food, construction materials; possible tool rental

  Event Details  

Date and Time

From: Tuesday, June 1, 2021

To: Tuesday, August 31, 2021

The program is for an overnight stay

Add to Calendar

Event Contacts

Mark Abernathy
mabernathy@ncbaptist.org
(919) 459-5607

Melanie Crawford
mcrawford@ncbaptist.org
(919) 459-5596

Location

Wasilla, AK, USA

Get Directions

  Registration  
Team Member AK21-011A
Choose "1" under "Choose Quantity". Note: A Team Leader has been registered for this project. In order to add to the project, you will need to know the "team name" (not the project number). This is a name that the team leader assigned when he/she signed up for the project. If you do not know this team name, please see your team leader or contact NCBM at mabernathy@ncbaptist.org or 919-459-5607. Costs for national projects vary. The team leader will negotiate costs with the project requester on the field and communicate this information to the team.
$0.00

 Feedback